Redevelopment opportunity in historic downtown Gaithersburg. Survey in Documents. Please do not enter building. Enter Building at your own risk. Storm water management evaluations were done along with boring tests, forest conservation plan and traffic flow assessment. Utilities to property have been cut/disconnected. Close to entertainment points of downtown and MARC Train (.2 Mile) Close to Metro Station (2.9 Miles) Buyer can build more than a two level building. Not deemed historical (Seller has approval from both the city and CSX)- ready for demolition if desired. Located within the framework of the Cityâs master plan.
MDMC2135270
General Commercial
City of Gaithersburg
MONTGOMERY
1899
<1--
-->
0.25
Acres
Public Water Service
Public Sewer
Loading...
The scores below measure the walkability of the address, access to public transit of the area and the convenience of using a bike on a scale of 1-100
Walk Score
Transit Score
Bike Score
Loading...
Loading...